AEROSPACE SUPERINTELLIGENCE · PROGRAM 04MISSION 04.2 · CONCEPT PHASE
MISSION 04.2 · SPACE DOMAIN AWARENESS

Know what is up there.
Keep it safe.

Orbit is getting crowded and contested. As sensors improve, the tracked catalog is heading past one hundred thousand objects, so every operator needs to know where everything is, what it is doing, and when to move.

CONCEPT PHASE · HOURS-TO-DAYS TIMELINE
FIG. / FUNCTIONAL CHAIN
  1. observeradar and optical, ground and space
  2. orbit determinationcovariance kept for every object
  3. screenconjunctions, collision probability, CDMs
  4. characterizemaneuver detection, pattern of life
  5. protectmaneuver, service, remove debris
  6. assesspost-event orbit determination, update the catalog
DETECT → ASSESS
CATALOG
Heading past 100,000 objects
REGIMES
LEO · GEO · cislunar
RULE
Do not add debris
THE THREAT

A crowded sky
needs a shared picture.

The risks range from debris to deliberate interference, and space weather affects them all.

DEBRIS

Collisions

Crowded shells raise the risk that one collision triggers more. Screening and removal keep it in check.

BEHAVIOUR

Unsafe approaches

Close approaches and co-orbital activity need detection, characterization and attribution.

WEATHER

Drag surges

Geomagnetic storms increase drag, scatter the catalog and bring objects down early.

THE ARCHITECTURE

Reuse what exists.
Add what is missing.

This mission's share of the five layers.

L0 · GroundReuse: Space Fence, the Space Surveillance Network, GEODSS, commercial radar and optical networks, civil traffic coordination
Add: A distributed small-telescope network for GEO and cislunar space; the shared deep-space radar
L1 · LEOReuse: Optical-crosslink transport mesh; commercial constellations as hosts
Add: SSA sensors looking up and out; inspector spacecraft
L2 · GEOReuse: GEO neighbourhood watch; commercial life-extension servicers
Add: Maneuverable GEO patrol satellites; refueling depots; debris-removal tugs on a common bus
L3 · CislunarReuse: Little dedicated capability today
Add: SSA sentinels at Earth–Moon L1/L2; relay and timing node
THE STANDARD

Open tools. Traceable evidence.

Concept phase: these are aims, not results.

An architecture is a hypothesis until a reproducible trade study says otherwise.

Every number on these pages is a planning estimate from public sources. The program's job is to replace each one with a traceable result from open analysis tools: stated assumptions, the tool version, the inputs, and the output. The work uses public, unclassified sources only.